Schweitzer Engineering Hall Construction Update, January 2025

As the year draws to a close, Schweitzer Engineering Hall prepares for winter work by shrouding the building in plastic. This step allows us modest climate control so concrete work can continue on the concrete slabs. Check out the newsletter (PDF).