Future Construction

Rendering of future buildings in the WSU engineering and design precinct.

Schweitzer Engineering Hall (under construction) is located on the Green parking lot south of Daggy and Carpenter halls.  

Future construction will be located on the second half of the Green parking lot next to Schweitzer Engineering Hall and on the sites of Dana Hall, the Electrical Engineering and Mechanical Engineering Building, Sloan Hall, and Daggy Hall.