This month construction crews are completing the last of the vertical cast-in-place foundation walls and preparing for the arrival of steel and Cross Laminated Timber (CLT). Waterproofing will continue below grade along with foundation drainage and backfill around the east side of the building. Read the WSU SEH Bulletin – October 2024 (PDF).